For this final project, the objective was to design an
interior space using a floor plan that we were given. We had to specify
materials to create an environment that was functional and aesthetically
pleasing for our client. We had to demonstrate skill in the measurement and
application of interior materials, demonstrate an understanding of the impact
of fire and life principles, and demonstrate understanding of the practical application
of the elements and principles of design. For this medical office building, I took
into consideration certain elements that we have learned about through the
course of this class. I used “green” sustainable materials where I could, and
appropriate materials for a medical facility as well. As far as the design is
ultimately concerned, I tried to make an inviting atmosphere where usually
there is none. It is never a fun thing to have to go to a doctor or medical
facility, so I tried to make it as non-medical and sterile as possible, while
still having the necessary elements.
To start, let us go over the materials used!
MATERIAL: Hardwood
Flooring
“Bright Angel,” Shaw Floors
I chose this material because it is durable, sustainable and
beautiful. Typically, one does not see hardwood floor in a medical office, but
lately there have been more modern offices that incorporate more
non-traditional flooring in their office space or reception area to make the
space less threatening or sterile. I incorporated the wood floor in the office,
conference room, hallways and reception area.
SUSTAINABILITY: This flooring features a green background. The
planks in the flooring are made from 100% recycled mill by-products. The solid
wood is hand-scraped which defines the grain pattern, and gives the floor a
scraped texture.
INSTALLATION: 8 foot planks to be installed.
MAINTENANCE: Regular wood floor dusting maintenance. This
flooring has a 50 year warranty, which means that as long as it is cared for
properly, it should last the lifetime of the building, and then some.
CALCULATION: 649 square feet
over the whole office facility, excepting the toilet area and the exam room.
MATERIAL: Tile
Flooring
“Ocean Wave,” by BuyTile
I chose this tile for the bathroom and exam room because it
is fun and non-traditional. The tiles are small and multi-colored. Because this
is a medical facility, this usually means that this sort of tile should not be
used due to the fact that germs and bacteria could grow in the grout, but with
an optional special sealant, it should be fine in this application.
SUSTAINABILITY:
The glass in these tiles is recyclable.
INSTALLATION: regular tile installation with the optional Epoxy
Rubberized Sealant.
MAINTENANCE: Tile is the perfect material in this application
because it is easy to clean, should any accidents occur on its surface.
“Royal Blue Poly Georgette” fabric
Used for window treatments in the conference center, office,
reception area and exam room
SUSTAINABILITY: Georgette
fabric is made from polyester fibers. It is crêpe-y and light and the perfect
fabric for window treatments. It is
easily dyed to vibrant colors. This particular fabric has been improved by
using recycled polyester.
INSTALLATION: curtains must be made as per the
specifications below, and hung over the windows in the facility.
MAINTENANCE: regular machine washing is recommended and
replacement should be considered about every year as well, since it is a medical
facility.
CALCULATIONS: for each window
treatment, 5 yards of fabric are needed, and there are 10 windows to be
covered. 50 yards of fabric will be needed.
How the Curtains should hang.
_________________________________________________________________
MATERIAL: Wall Paints
“Iroquois Falls,” and “Waxen Moon,” both by Mythic Paints,
used all throughout the facility.
SUSTAINABILITY: Mythic Paint boasts that their paint is a
non-toxic, ultra-low-odor paint that provides the durability and coverage that
is expected from a premium paint without the off-gassing from VOC’s and other
harmful toxins. By using this sort of paint in the medical facility, it is
reducing a person’s exposure to cancer-causing toxins that are deposited into
the air by less environmentally-friendly paints.
INSTALLATION: regular painting application.
MAINTENANCE: regular wall dusting and cleaning, repainting
should be considered every 3-5 years.
CALCULATIONS: there are 1,386
square feet to be covered in the “Waxen Moon” paint, and 772 square feet that
need to be covered in the “Iroquois Falls” paint.
Iroquois Falls
Waxen Moon
_________________________________________________________________
Some Samples:
_________________________________________________________________
And Finally, the Finished Project!!
Conference Room
Office
Reception Desk
Exam Room
Toilet Area
Reception Area
Final Floor Plan





















.jpg)